Clients : Pure Drinks Pvt Ltd.
Architects: Bharadwaj & & Bharadwai
(Part work), Delhi
M/s. Raja Aederi Consultants Pvt Ltd
Consultants:
Strucutal consultants : M/s Sterling
Engineering Consultancy Services Pvt Ltd.
Bombay
HVAG: M/s Spectral Services
Consultants Pvi Lid
Plumbing, fire fighting: M/s RK Gupta &
Associates
Kitchen: Madho Thakkar
Acoustic and public address
systems: Ms Suri & Suri
Electrical: M/s Spectral Services
Consultants Pvt Ltd
Contractors/Suppliers/Manufacturers:
Piling: M/s AFCONS Ltd, Bombay
R CC works: M/s Shah Construction
Company Ltd. Bombay
Civil & interior: M/s Tirath Ram Ahuja
Pvt Ltd
Furniture works: M/s Oriental Building
& Furnishing (OBF)
Electrical works: M/s Ambassador Electricals
Switch gearboards: M/s Larson &
Toubro, M/s Kanishk
Lights: M/s Kapoor
M/s Decor, M/s Phillips
Lock and energy saver: M/s Vingcard
Air-conditioning: M/s voltas Ltd
Curtain wall glazig:M/s Ecie
Fire fighting: M/s Mather Platt
Plumbing sanitation: M/s S Bhusan
M/s S Soni
Magnetic cards:wing Norway
Musuc system: M/s Phillips Ltd
Suspended Restaurant Steel Work
Roof top, Steel Work, Multi Beam, Catwalk and laying of decking on top of terrace including MS Rain Water Gutter.
Making and fixing of MS Louvers all-round the four sides on terrace as per architectural design.
Making and fixing of MS Canopy of Commercial Tower. The canopy main structural members are resting on rocking MS Plates.
Providing, making of MS Tubular Framing and chain link fencing in Tennis Court, Boundary Wall, Cooling Tower, etc. Front area of Boundary Wall from Gate No. 2 to Gate No. 4 including MS Boundary Wall, Grills and MS Gates of Gate No. 4, Gate No. 3, Gate No. 2 and Gate No. 1. The Gate No. 4, Gate No. 2 is replaced by SS Gates by Vistar Agency through renovation.
Making and Erection of MS Trolley Track on terrace of main hotel for maintenance job and cleaning of glass, etc.
Providing, fixing of ceiling comprising of MS Trays, tee iron, ceiling in room service kitchen, coffee shop area, chinese kitchen and main kitchen and roof top kitchen (the ceiling of main kitchen, coffee shop, chinese kitchen is replaced with SS Trays during renovation).
2 Nos SS Doom's in ETP area (photo attached).